Wind Measurement Campaigns — Nordics, Baltics & Poland

Reduce Uncertainty in Your Wind Farm Energy Yield Assessment

We design, install, and operate IEC-compliant LiDAR and met mast measurement campaigns that deliver bankable wind data, from permit to decommissioning.

✓ 250+ bankable campaigns delivered since 1998
✓ LiDAR and met masts up to 198m
✓ Optional technical availability guarantees

250+

Bankable Campaigns

50+

Clients Served

20+

Years Experience

4

Countries

How Your Wind Measurement Campaign Works

Step 1: Consultation

We discuss your project goals, site conditions, and measurement needs.

h

Step 2: Design & Permitting

Our engineers design an IEC-compliant campaign and handle permit applications.

Step 3: Installation & Monitoring

Our certified field team installs and operates the equipment with continuous monitoring.

Step 4: Bankable Data

You receive bank-grade measurement data ready for your energy yield assessment.

Why Wind Energy Developers Choose Us

Minimize Assessment Uncertainty

Campaigns designed by engineers and wind analysts to reduce energy yield uncertainties, giving you stronger financing cases.

R

Full-Service, Turn-Key Campaigns

From permits and design to installation, monitoring, and decommissioning. You get bankable data without managing the logistics.

Proven in Harsh Conditions

From Arctic to Antarctic installations, we specialize in cold climate and icing environments where standard setups fail.

Met Mast Measurement Campaigns

We design and install lattice met masts up to 198 m, compliant with IEC 61400-50-1:2022. Our HSE-focused field team are certified mast climbers with decades of experience. 250+ campaigns delivered since 1998.

Remote Sensing: LiDAR Campaigns

50+ bankable LiDAR campaigns delivered onshore and offshore across Northern Europe since 2009. We work with WindCube V2.1, WindCube 400s, and ZX300 devices, following IEC 61400-50-2:2022 standards.

Get in Touch About Your Project

Tell us about your wind measurement needs and we will come back to you with a recommended approach.

Offices in Norway, Sweden, Finland and Iceland.

Ola Kaas Eriksen

Field Measurements Manager

Ola.Kaas.Eriksen@norconsult.com

Pyry Pentikäinen

Senior Advisor & Wind energy LiDAR Product Leader

pyry.pentikainen@vindteknikk.com 

    Frequently Asked Questions

    How long does a typical wind measurement campaign take?

    Most campaigns run for 12 to 24 months to capture seasonal variations and meet bank requirements.

    What is the difference between a met mast and a LiDAR campaign?

    Met masts provide highly accurate measurements at specific heights. LiDARs are ground-based remote sensing devices that measure wind at multiple heights without a physical structure. We can advise on which approach is best for your project.

    Are your measurements accepted by banks?

    Yes. All campaigns comply with the latest IEC standards and we have delivered 250+ bankable measurement campaigns.

    Do you handle permits and regulatory approvals?

    Yes. We manage the complete process from permit application through to decommissioning.

    Can you measure in cold or icing conditions?

    Cold climate measurement is one of our core specialties. We design heated sensor setups and have extensive experience with ice sensors.

    Ready to Get Accurate, Bankable Wind Data for Your Project?

    With 20+ years of experience, 250+ successful campaigns, and expertise in the most challenging climates in the world, Kjeller Vindteknikk is the partner you can trust for your wind measurement needs.